[ PLATFORMS ]

Configure the platform, not the catalogue

Every selection moves mass, power and endurance. The specification below updates as you build, and exports as a sheet you can put into a requirement draft.

Platform classes
11
Indigenous content
68 – 82 %
Lead time band
6 – 32 wks
Domains live
2 of 3

Three domains, one autonomy stack, one operator station.

Air platforms — family shot
01 / AIR8 CLASSES
Air

Quadrotor through fixed-wing VTOL tiltrotor. Vertical launch and recovery across every class, no prepared surface, no catapult.

Payload range250 g – 50 kg
Endurance26 min – 8 hr
Classes flying6 of 8
Configure below ↓Tiltrotor 50 →
Rover on unprepared ground
02 / LAND2 CLASSES
Land

Wheeled rover and legged mule. What keeps moving when the air picture is contested and the load is too heavy to fly.

Payload range30 kg – 60 kg
Operating time2 hr
Classes flying1 of 2
Configurator in build
Reserved — AUV
03 / WATERCOMING
Water

Sub-surface agents under the same autonomy stack and the same operator station. Named here because it is on the roadmap, not because it exists.

Payload rangeTBC
Operating timeTBC
Classes flying0 of 1
Not yet configurable
[ Build it ]

Seven decisions, one specification

Nothing here is hidden behind availability. Options that a class cannot carry stay on the page, greyed, with the reason stated.

Frame viewer
Air · Quad X
QUAD_X
MTOW 6.5 kg
Multirotor
VTOL
Fixed wing

The frame follows the payload class, or pick one directly.

Mass budget62% OF PAYLOAD USED
Airframe + base avionics2.8 kg
Energy1.7 kg
Fitted above base1.24 kg
Remaining0.8 kg

Tier 1 avionics and one mesh radio are carried in empty mass. Payload capacity is mission load.

Starting points
01Payload class2 kg
02PowerplantBATTERY
03Energy capacity300 Wh
200 Wh600 Wh
04Autonomy tierTIER 2
05GNSS-denied navigationENABLED
06Payload fitEO/IR GIMBAL
07CommunicationsMESH
Link paths
Endurance
34 min
Range
15 km
Payload remaining
0.76 kg
Max takeoff weight
6.5 kg
Spec sheet
[ What comes out ]

A sheet that survives a requirement draft

Every configuration exports as a record with the selections, the derived performance, the maturity evidence and the lead time band. No prices, at any point.

EMBODIMENT SYSTEMS
Platform configuration sheet
ES-AIR-2K-T2-GD-D2AD
Rev 01
Air · 2 kg class · Quad X
Company-level multirotor carrying a gimballed sensor or a light effector. The workhorse of the air fleet.
Configured asset
Quad X · QUAD_X · 2 kg classMTOW 6.5 kg
Selections
Payload class2 kg
PowerplantBattery
Energy capacity300 Wh
Autonomy tierTier 2 — Forward and rear avoidance
GNSS-denied navigationFitted
Payload fitEO/IR gimbal
CommunicationsRF mesh
Derived performance
Endurance34 min
Range15 km
Payload remaining0.76 kg
Max takeoff weight6.5 kg
Autonomy tierTier 2
GNSS-deniedYes
Indigenous content80 %
Lead time8–10 wks
Maturity
TRL 6
TRL 6 | 96 flight hours across 41 sorties, Jan 2026 to Jul 2026
Indigenous content
80 %
By bill-of-materials value. Airframe, flight controller, autonomy stack and communication module designed and built in India.
Lead time
8–10 wks
From order confirmation, quantity dependent. Trial units may be available sooner.

Figures are derived from the configuration above and are indicative pending acceptance testing against a stated requirement. Full technical data, trial records and integration detail are released under NDA.

Send this configuration

We respond with a technical point of contact, not a sales sequence.

Attached
ES-AIR-2K-T2-GD-D2AD
2 kg · Tier 2 · GNSS-denied
EO/IR gimbal · RF mesh

Copy the link from the dock above to send the same configuration to a colleague.

[ Requirement ]

Send the configuration, not an order

Add each asset you need with a quantity. What reaches us is the specification table for every line, with your note attached. Nothing is priced and nothing is committed.

No configurations added yet.
Build one above and press Add to requirement.
[ Fleet builder ]

One platform is not a capability

Compose saved configurations into a force mix and the topology resolves itself. Start from a worked mission, then strip it back.

Saved configurations
Persistent tracking
2 kg ISR
ES-AIR-2K-T3-GD-8604
GNSS-denied · EO/IR
4MESH
20 kg relay
ES-AIR-20K-T3-GD-93FB
Comms relay · SATCOM
1MESH + SATCOM
Ground station
ES-GCS-01
Mesh · LTE
1MESH + LTE
Comms topology
RF MESH4G / 5GSATCOM
6 assets · one ground station · one operator
Operator to asset ratio
1 : 6
One operator station. 6 assets under intent-based tasking.
Total assets6
Air / ground5 / 1
Sustained on station3 of 6
Coverage area1090 km²
Combined indigenous74 %
Combined lead time16–22 wks
If SATCOM is lost

5 of 6 assets retain link. The mesh reforms around the remaining relay within 40 seconds; the 1 SATCOM-dependent assets fall back to mesh at reduced range.

Bring a requirement, not a shortlist

Send a configuration and we respond with a technical point of contact. Full data and trial records under NDA.